Project Schedule Review
Answer:
Question 1
Measured material quantities
The trades selected for this task are ceramic floor tiling and carpeting of level 2 of the building. For the ceramic floor tiling, the task selected is fixing the ceramic tiles on the floor whereas the selected task for carpeting is fixing the carpet directly on the floor.
Task 1: Ceramic floor tiling
The ceramic tiles are fixed on the floor of the following rooms/elements on level 2 of t…