Week 3 attachment is the selected project to use for this assignment. The other attachment is just an example of how the assignment structure should be and some guidelines. Please follow all guidelines.

Work Breakdown Structure (WBS): A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables.

According to the PMBOK® Guide, “The WBS organizes and defines the total scope of the project and represents the work specified in the current approved project scope statement. The planned work is contained within the lowest level of WBS components, which are called work packages. A work package can be used to group the activities where work is scheduled and estimated, monitored, and controlled. In the context of the WBS, work refers to work products or deliverables that are the result of activity and not to the activity itself.”

Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) – Sixth Edition, Project Management Institute Inc., 2017, Page 157.

The WBS is used to create the project schedule based on the activities needed to complete the work of the project.

Based on the selected project of interest create a WBS. Among other things, be sure to:

Identify and analyze the project deliverables

Develop the structure and organize the WBS

Decompose the upper WBS levels into detailed components

Determine identification codes for the WBS components

Verify the degree of decomposition is appropriate

Instructions for Week Eight Individual Project Assignment

This assignment requires us to learn and apply the due processes of creating a work breakdown structure in terms of actual project management. 

Note: The first question above is: 1. Identify and utilize the project deliverables.

Note that the assignment requires the following in the answer: 

a. The Project Charter with information on the project team and other components

b. The project Scope statement (based on the Executive Summary and Project Charter)

  1. c. The project images (drawings, design, layout, perspective images, pictures)
  2. d. The work packages and activities (all such needed to complete the project)
  3. e. The work breakdown structure (WBS) Not just a table or list of works sets but a structure diagram
  4. f.The preparation of WBS is towards creating a project schedule.
  5. In academia, you are encouraged to write out every segment of the assignment and add tables and diagrams to illustrate some portions of the information. See the expected structure of the work as shown below:

Your assignment essay should have:

1. A main Heading, and an introductory paragraph that says the creation of WBS is based on the project charter and the Scope Statement 

2. The project charter (text and diagram) 

3. The Scope Statement, (text, and template, but the diagram is optional) 

4. The Project images (drawings, design, layout, perspective images, pictures)

5. The work packages and activities (all such needed to complete the project)

6. The Work Breakdown Structure (not a table or list of works sets)

7. Structure Diagrams and templates improve visibility [see article for Work Breakdown Structure samples]

8. Apply APA as indicated in our General Presentation Guide and previous comments on marked assignments.

9. An essay or paper is incomplete without a Conclusion Heading and paragraph

Get your college paper done by experts

Do my question How much will it cost?

Place an order in 3 easy steps. Takes less than 5 mins.